Case studies and walkthroughs
How a community is set up, step by step.
Each walkthrough shows a real community layout configured in GuestPark: buildings, visitor spaces, limits, signs and patrol. Walkthroughs describe configuration only. Measured results will be published separately, labelled as such, and only with the community’s permission.
Deployment walkthrough · Orlando, Florida
Guest parking for a 308 home, three building community in Orlando
Three buildings, 308 homes, 42 visitor spaces and residents who read English, Portuguese and Spanish. This is how GuestPark is configured for that layout, what each person on the property sees, and what to measure in the first 90 days.
Running at your property this week.
Add buildings and homes, print the lobby and space signs, hand patrol the PIN. Or try every side first in the live demo.